← Six Sigma (DMAIC) · All cheatsheets
Operations & Quality · Framework cheatsheet

Six Sigma (DMAIC)

ManagementOnlymanagementonly.com

A data-driven method for reducing defects and variation, run through five phases.

What it is

Six Sigma aims to make a process so consistent that defects become extremely rare. It treats variation as the enemy of quality and uses statistics to find and remove its causes.

Improvement projects follow a fixed sequence known as DMAIC, led by trained practitioners.

When to use it

When a process produces too many errors or inconsistent results and the causes are not obvious, and when data is available to analyze.

1Define
→
2Measure
→
3Analyze
→
4Improve
→
5Control

The five phases

  1. Define State the problem, the customer requirement and the project scope.
    Ask: What is the problem, and for which customer?
  2. Measure Collect data on current performance.
    Ask: How big is it today?
  3. Analyze Find the root causes of defects and variation.
    Ask: What is the root cause, by the data?
  4. Improve Develop, test and implement solutions.
    Ask: Which fix removes the cause?
  5. Control Put monitoring in place to hold the gains.
    Ask: How will we keep the gain?

Example

An insurer finds that one in eight claims is paid incorrectly. Measuring by claim type shows that most errors come from two manual data-entry fields. Validating those fields automatically cuts the error rate by three-quarters, and a weekly control chart keeps watch.

How to run it

  1. Charter the project with a measurable goal.
  2. Establish a baseline you trust.
  3. Prove the causes before choosing solutions.
  4. Pilot the fix, then put controls in place.

Limits

Projects can be slow and heavy for simple problems, and the certification structure can become an end in itself. It is better at improving existing processes than at inventing new ones.