A four-step loop for continuous improvement: plan, do, check, act.
PDCA is a simple, repeatable method for testing a change and learning from the result. Instead of rolling out a solution everywhere, a team tries it on a small scale, measures what happened, and then decides whether to adopt, adapt or drop it.
Each turn of the cycle builds on the last.
For any process improvement, problem-solving effort or pilot of a new idea.
A clinic wants to cut missed appointments. It plans a text reminder two days ahead, tries it with one doctor's patients for a month, finds no-shows fall by a third, and extends it to the whole clinic.
It is slow for urgent problems, and teams often skip the check step and treat a plan as proven. Its simplicity hides the discipline needed to measure honestly.
It derives from Walter Shewhart's work at Bell Laboratories in the 1920s and 1930s and was popularized by W. Edwards Deming, who preferred the name plan-do-study-act.
Profile: W. Edwards Deming — The quality movement: 14 points for management and the plan-do-study-act cycle.
Facts on this page were checked against Wikipedia.