Operations & Quality

PDCA Cycle

A four-step loop for continuous improvement: plan, do, check, act.

Also called: Plan-do-check-act, Deming cycle, PDSA

One-page cheatsheet (printable) →

PDCA is a simple, repeatable method for testing a change and learning from the result. Instead of rolling out a solution everywhere, a team tries it on a small scale, measures what happened, and then decides whether to adopt, adapt or drop it.

Each turn of the cycle builds on the last.

01When to use it

For any process improvement, problem-solving effort or pilot of a new idea.

02The four steps

4
  1. 1Plan
    Define the problem, set a target and decide what change to test.
  2. 2Do
    Carry out the change on a small scale.
  3. 3Check
    Compare the results with what was expected and learn from the difference.
  4. 4Act
    Standardize the change if it worked, or adjust and run the cycle again.

03Example

A clinic wants to cut missed appointments. It plans a text reminder two days ahead, tries it with one doctor's patients for a month, finds no-shows fall by a third, and extends it to the whole clinic.

04Limits

It is slow for urgent problems, and teams often skip the check step and treat a plan as proven. Its simplicity hides the discipline needed to measure honestly.

05Where it comes from

It derives from Walter Shewhart's work at Bell Laboratories in the 1920s and 1930s and was popularized by W. Edwards Deming, who preferred the name plan-do-study-act.

Profile: W. Edwards Deming — The quality movement: 14 points for management and the plan-do-study-act cycle.